Lockout/Tagout (LOTO) isn’t just a concept — it’s a critical safety procedure that must be put into practice correctly and consistently. If implemented improperly, it can give a false sense of security that will put your workers at risk. In this follow-up article, we’re digging into what a compliant LOTO program really looks like on the ground, where companies go wrong, and what you can do to stay ahead of OSHA enforcement.
Core Elements of a Lockout/Tagout Procedure
A written Lockout/Tagout program needs to include clear, specific procedures for each piece of equipment that stores hazardous energy. That includes:
- Shutting down equipment properly
- Isolating all energy sources (electrical, pneumatic, hydraulic, mechanical, thermal, etc.)
- Locking and tagging all energy isolation points using appropriate devices
- Verifying that the energy is truly isolated before work begins
- Re-energizing equipment only after removing tools, reinstalling guards, and ensuring all workers are clear
Each procedure must be tailored to the equipment. A generic, one-size-fits-all approach won’t pass muster.
Getting Started: Launching a Lockout/Tagout Program
If you’re starting from scratch (or rebuilding after realizing your current program isn’t cutting it), here’s how to lay the foundation for a compliant and effective Lockout/Tagout program:
1. Inventory Your Equipment
Start by identifying all equipment and machinery that requires LOTO. You’re looking for any machine with stored or potentially hazardous energy, including electrical, hydraulic, pneumatic, thermal, or mechanical.
2. Identify All Energy Sources
Each machine may have multiple energy sources. Due to this, it is necessary to create a list of every type of energy that needs to be controlled — this is the backbone of your equipment-specific procedures.
3. Write Equipment-Specific Procedures
Develop step-by-step Lockout/Tagout procedures for each piece of equipment. Include:
- Shutdown steps
- Energy isolation points
- Lockout device placement
- Verification steps
- Safe work start and end procedures
- Restart protocols
Avoid generic templates — OSHA requires procedures to reflect the actual equipment in use.
4. Provide Training
You’ll need to train employees to properly understand uncontrolled energy hazards stemming from equipment and materials onsite. They should know how to avoid being caught in such situations and how to recognize when co-workers or contractors may be putting themselves at risk. Further, they should also know the proper procedure for locking out and tagging energized assets onsite, as well as how to safely remove such safety devices to resume normal work. Even if they’re not immediately part of a job, each employee should be empowered to stop a job if they feel work is being conducted in a potentially risky manner.
Make sure training is documented and updated when procedures change or new equipment is added.
5. Supply the Right Equipment
Have an inventory of locks, tags, hasps, and lockout devices available and ready for use. Above all, equipment should be standardized and clearly labeled. Additionally, any damaged or ineffective devices should be replaced immediately.
6. Enforce & Audit
Set expectations for compliance and enforce them consistently. To that end, you must perform annual audits to ensure procedures are followed and remain effective. Audits must include a review of actual performance and retraining if needed. These audits are not intended to investigate the specific individual, but the program as a whole.
Common Pitfalls to Avoid
Many companies have a LOTO program on paper, but it’s the execution that counts. Here are some of the most frequent mistakes that lead to citations, accidents, or both:
❌ Incomplete Equipment Lists
LOTO procedures must apply to every piece of equipment with hazardous energy. In other words, if you miss one, you’ve got a compliance gap. If you discover equipment missed in the initial assessment, it may be necessary to investigate further into the methods of the assessment to discover why why it was missed, and what other assets may have been missed as well.
❌ Missing or Outdated Procedures
Procedures must be written and equipment-specific. If they don’t reflect current machine configurations, they’re not valid. This should be assessed in the annual review of the LOTO system.
❌ Inadequate Training
Authorized employees (those performing LOTO) must receive detailed training. A one-time presentation doesn’t cut it — especially after equipment changes or personnel turnover. It may also be necessary, (in fact, recommended) to test the knowledge and retention of trained employees on this subject.
❌ No Annual Inspections
OSHA requires annual inspections of LOTO procedures. Specifically, this means physically observing the steps in action and certifying that they’re followed correctly. Undoubtedly, missing this crucial step will lead to program decay. It is similar to changing the break pads on your car and never checking them again!
Pro Tips for Staying in Compliance
Here are a few ways to make sure your program doesn’t just look good — it works:
- Use visuals. Include diagrams in your procedures to make isolation points crystal clear.
- Standardize devices. Keep lockout devices and tags consistent, well-stocked, and easy to access.
- Practice drills. Run through LOTO scenarios to build confidence and catch issues before they lead to citations.
- Engage your team. Create a culture where employees speak up about safety concerns — and act on them.
Final Thoughts
In short, a good Lockout/Tagout program is the difference between a normal, boring day of work and a catastrophe. When done right, it’s a seamless part of your workday. When neglected, it becomes one of OSHA’s top citations — and a major liability.
If you’re unsure whether your LOTO program checks all the boxes, get a second set of eyes on it. A quick assessment today can prevent a serious injury — or serious fine — tomorrow.


